I got one side of the tumblehome done. I made 6- 10.5 foot sections. Three for each side. I wanted to have a continuous strip just like the shear strip. The rest o the boat will be 8 foot strips butted to 10 foot. I'll get the other side tomorrow. One more hour.
Day two went well. Got about 20 strips on.
No comments:
Post a Comment